Furnace Calculator
Calculate smelting times, fuel requirements, and optimize your furnace setup
Select Furnace Type
Select Ore Type
Select Fuel Type
Smelting Results

1,000
Metal Ore
→

1,000
metal_fragments
Total Time2m 20s


Ore/Second:7.14
Time Saved:Base speed
Fuel Comparison
Fuel Type | Burn Time | Stack Size | Total for 1000 Metal Ore | Stacks Needed | Special |
---|---|---|---|---|---|
![]() | 30s | 1000 | 5 | 1 | Produces 0.75 charcoal |
![]() | 30s | 1000 | 5 | 1 | - |
![]() | 120s | 500 | 2 | 1 | - |
![]() | 120s | 500 | 2 | 1 | - |
![]() | 120s | 500 | 2 | 1 | - |
Pro Tips
Furnace Efficiency
- • Large furnace is 18x more efficient than small
- • Electric furnace smelts 2x faster but needs power
- • Multiple furnaces reduce total time linearly
- • Small furnace processes slots sequentially
Fuel Tips
- • Wood in small furnace produces charcoal while smelting
- • Low grade fuel burns 4x longer than wood/charcoal
- • Large furnace can use wood OR charcoal in any slot
- • Always fill all slots for maximum efficiency
Related Items & Guides
Large Furnace
18x more efficient than small furnace
Electric Furnace
2x speed smelting with electricity
Metal Ore
Smelt into metal fragments for crafting
Sulfur Ore
Essential for crafting explosives
Electricity Guide
Power your electric furnaces efficiently
Raid Cost Calculator
Calculate sulfur needs for raiding